Steel reinforcement (rebar) in concrete footings generally acts in tension to resist bending loads that arise as the footing spreads loads uniformly over the soil underneath. However, those tension loads have to be transmitted between the concrete (where the load is applied) and the rebar. For this to happen, there has to be enough âgripâ between the concrete and the rebar - otherwise the rebar would just get ripped right out of the concrete! Because rebar breaking out of concrete is generally an undesirable scenario (think a sudden bang with no warning), engineers generally ensure that thereâs enough grip between concrete and rebar to ensure that the rebar reaches its full yield strength. That lets us use the full strength of the steel for greater efficiency, and is accompanied by large movements thatâll give plenty of warning to occupants.The length of rebar required to achieve the necessary grip is what we call the development length. Since the rebar can be considered âineffectiveâ over its development length, itâs desirable to minimize this length as much as possible. The most common way to reduce this length is to add ribs to the rebar, which grip the concrete around them. Another solution often employed is to âhookâ bars by bending the ends 90 degrees, which significantly reduces the required development length at the expense of having to bend rebar and fitting the âhooksâ. Note that the bigger the bar, the longer the development length required, as they can take more force!
As previously described, itâs generally very desirable to âfully developâ bars, which means providing enough development length that the rebar can reach its full yield strength before ripping out the concrete. This is also reflected in building codes, which will almost always require that rebar be fully developed. For instance, ACI 318-19, the concrete design standard principally used in the USA, provides equations for development length that directly depend on the yield strength of the rebar. The equation below is taken directly from ACI 318-19, as implemented in ClearCalcs.Providing this development length is an essential part of reinforced concrete design. Formulas and methods used to analyze the strength of concrete members are practically all dependent on the assumption that the rebar can reach its full yield strength. Thus, not providing enough development length can very much lead to premature failures.However, to account for the fact that it may be impractical to reach full development lengths in some situations (the largest bars can require over 10 feet of development length!), the code also allows reducing the development length, in some cases, as a proportion of the required steel vs what is provided. So if far more steel is provided than is required, the development length may be reduced - but only down to a hard limit of 12 inches, and it canât apply to reinforcement provided for things like increased ductility or when resisting seismic loads.
When calculating the rebar required in footings, we look at a critical section for bending moment, generated by the action of load being spread uniformly from the column to the entire area of the footing. As you can see on the image below, the available length for development of the rebar is the distance between the column face and the footing edge, less the concrete cover.In larger footings such as used in commercial buildings, itâs generally never an issue to achieve development of the rebar. However, in smaller footings such as in residential construction, this can be a problem. Even when using small bar sizes and applying all the reductions allowed by the ACI 318-19 code, weâre still left with the 12â hard limit on development length, which, if combined with 3â cover and assuming a 6âx6â post, means we need a footing at least 3 feet wide. This may often be larger than typical construction practices, which have been proven time and time again to be sufficient. So how do we accommodate this? Letâs look at one solutionâŚ
If we donât want to deal with rebar development length, thereâs one simple solution: skip the rebar! Indeed, the ACI code specifically allows concrete footings to be designed without any rebar, using the small tensile capacity of concrete to resist the bending loads we discussed previously. In reality, this winds up being more of an âarchâ action, where load gets spread in compression diagonally into the soil below. When using these provisions, thereâs nothing saying we canât actually still include rebar in there - just that we canât consider it to strengthen the footing.Specifically with small residential footings where loads are small and the footings relatively âstubbyâ, itâs almost always the case that footings will be adequate when considering only the plain concrete. So if youâve had the same typical detail for small footings calling out a small grid of #5 rebars for the last two decades and were surprised to find that it wasnât passing due to development length, fear not! The best way to handle this in ClearCalcs is to design as Plain Concrete, and simply to specify your desired rebar pattern in your drawings afterwards.